Home > Buy Now > Engines > Gas Turbine Generation Set of 2mw, 10mw, 50mw, 13mw
 


China National Electric Wire & Cable Import Export Co.
 
icon Products
icon Reference Lists As EPC or Main Contractor in Electricity Generation, Transmission, Distribution
icon Technical Design of Main Equipment of Geothermal Power Plant

line

icon Company Profile
icon Selling Leads

line


icon To Chinese Page


 
Contact us
China National Electric Wire & Cable Import Export Co.
[China]
Address:
langjiayuan Chaoyang Beijing 100004 China
Phone:
0086-10-84568952
Contact name:
yang chun lin , Manager
Inquire now










China National Electric Wire & Cable Import Export Co.



 
Products

Gas Turbine Generation Set of 2mw, 10mw, 50mw, 13mw

Inquire now



We can provide you gas turbine generator sets in the form of combined cycle gas turbine power plant, in which the exhausted gas from the gas turbine can be transferred to power through the added equipments of recovery boiler and steam turbine. Co-generation gas turbine power plant is composed of a recovery boiler to utilize the high temperature exhausted gas from the gas turbine into steam. The common capacity of the gas turbine power plants from us range from 2MW, 10MW, 20MW, 38MW, 50MW, 135MW and their combination of your required capacity. The applied technologies is of compatible of Siemens and GE and even Chinese innovated ones from aero-space industries. Here we just provide 2mw, and 10mw unit capacity as example for introduction due to their not so articled in our catalogue. PERFORMANCE PARAMETER of 2MW GAS TURBINE GENERATOR SET 1. Gas Turbine engine (under ISO) Gas turbine rotating speed (rpm) 12087 Output shaft speed (rpm) 1000 Rotating direction of output shaft (rear view) Counterclockwise Air flow (Kg/s) 20.4 Rated output power (kw) 2130 Maximum output power (kw) 2350 Heat consumption (MJ/kwh) 17.09 Overall dimension (mm) 3560x892x1174 Mass (kg) 1120 Fuels: Coke-oven gas, light diesel, oil field gas, natural gas and so on . 2. Heat Recovery Boiler (supplying with vapour-gas) When gas turbine is under the rated working condition Vapour volume (t/h) 6.5 Vapour pressure (Mpa) 0.8-1.2 Vapour temperature (Celsius degree) 169.6 3. Generator Rated output voltage (Kv) 6.3 or 10.5 Power factor (lag) 0.8 Frequency (Hz) 50 Output power (Kw) 2000 Rated power (Kw) 2500 4. Flexible coupling Nominal torque (N.m) 4000 Max permitted speed (rpm) 2000 CONTENT OF SUPPLY of 2MW GAS TURBINE SET The set of 2MW gas turbine co-generation power station chiefly consists of the following parts. 1. Gas Turbine section (Excluding compressor) 2. Generator section 3. Recovery boiler 4. Switch Unit.5. Control System 6. Dc control cabinet 7. AC control cabinet 8. Protection system 9. Main control desk 10. Control Desk of Recovery Boiler 11. Connecting Wires and cables use in the Station 12. Primary Instrument Installing Board 13. Terminal Box 14. Special Tools 15. Floor Bolt of installation equipment 10MW GAS TURBINE GENERATOR SET 1. Main technical parameter of 10MW Co-generation GAS TURBINE GENERATOR SET (under ISO condition) 1.1 Heat performance of unit Base load Peak load Rated generating power(KW) no less than 11500 no less than 13200 Heat efficiency of unit 27% 27.8% Heat rate KJ/KW.h 13333 12950 1.2 Performance of gas turbine Base load Peak load Air flow at the compressor inlet (kg/s) 60.07 62.45 Compressor boost ratio 11.76 12.47 LP rotor speed (rpm) 10174 10200 HP rotor speed (rpm) 11791 12008 Power turbine speed (rpm) 4700 4700 Gas flow at power turbine inlet (kg/s) 60.47 62.94 Gas temperature at power turbine outlet (K) 767 787 Rotation direction of power turbine rotor CW(viewed from the direction of air-inlet) Pressure at exhaust scroll case outlet (105Pa) 1.013 1.013 Flow speed at exhaust scroll case outlet (m/s) 41 43 Area of exhaust scroll case outlet (m2) 3.2671 1.3 AC generator Rated power 15000kW Rated speed 3000r/pm Rated voltage 6.3kV Rated power factor 0.8 Frequency 50Hz Efficiency ≥97% Cooling method Upper water cooling Rotation direction CW (viewed from excitation) 1.4 Gas turbine first overhaul period Gas generator no less than 6000 hours Power turbine no less than 40000 hours



Inquire now